They should be stopping by the marina to pick it up soon.
I setup new batteries for the house bank, in place under the starboard quarterberth. I ordered wire that will connect the batteries together and got to use my hammer crimper for the first time. I think it turned out well and finished nicely with heat shrink. I'll shorten and finish the other end when I'm at the boat next time.
![]() | |
| 4 gauge to connect between two house bank batteries |
![]() |
| heat shrink in place |
I was looking over the current wiring beyond the battery bank, on top of the fresh water tank and looking to redo some of them. Current wiring that went to the batteries had 5/16" terminals but need to be changed to 3/8". In general, I think it could be cleaned up a bit, with identifying where they go and putting some labels on them.
Now the mast will be away, I can get back to other projects.
One of the other projects I'm working on is putting together an electrical panel with breakers by the nav desk. I originally wanted to use a bus bar to connect the new VHF in its new position without running multiple wires back to the batteries. Someone suggested I install an actual breaker panel to make sure power is disconnected so went with that idea instead. There will be enough positions for breakers to add a few other items if/when the time comes to expand the electronics.
I ordered the panel through Front Panel Express using their free software was pretty easy to put together. Black anodized aluminum with the HIN engraved into the panel. The breakers are Blue Sea A-series. Blue Sea is nice in that they have the dimensions for hole spacing and cutout templates for their products.
Next post I'll show the panel after it arrives.












