1. Finish Fuel tank
a. need to install a fitting for venting
b. install hoses to engine
2. Reinstall Engine
a. install water lift muffler/exhaust hoses
c. install new stuffing box hose
d.
e. redo cockpit drain hoses (a couple need redone to get two hose clamps on seacock)
f. new hose clamps as needed
g.
h. mount air filter
i. mount raw water strainer
3. Mast refurbish
a.
b. raise mast
4. Bottom Job
a.
b.
c. paint barrier coat
d. bottom paint
e. paint more on red stripe
f. reapply new name / home port decals to hull
g. refinish (sand/wax) gelcoat
5. Bilge pumps:
a.
b. service manual bilge pump, if I can get the thing out
a. Fix wood trim and toe rail
b. Fix stern rail
d. Install new Monitor wind vane
1.
2. Rebed deck/cockpit hardware (cleats, winches)
3.
4. Service Winches (clean, grease/oil)
5. Install SmartPlug shore power plug
5. To get after launching:
a. Safety (Horn, PFDs, Flares, Med kit)
b.
c.
d. Paint Interior Compartments
e. Update cabin cushions (have fabric already)
f. Update exterior Canvas
g. Cockpit foot-well grate and cockpit cushions
h.
i.
Hope to launch some day this year. But as previous plans have gone, we'll have to wait and see. She's ready when she's ready.
When getting ready to, or after, launch I'd like to get an updated survey.
updated: 30 June 2019
No comments:
Post a Comment